Malik Bugaev
Steel trellis and fabric panels of the Al Wasl Plaza dome at Expo City Dubai, seen from below

Expo City Dubai

Al Wasl Plaza

Al Wasl Plaza was the centre of Expo 2020 Dubai: a steel trellis dome 130 metres across and 67.5 metres high that doubles as a 360-degree projection screen. Designed by Adrian Smith + Gordon Gill Architecture, it now anchors Expo City Dubai and holds the Guinness World Records title for the largest interactive immersive dome.

Photo: Ahmad Dalain, CC BY-SA 4.0, via Wikimedia Commons

A square called connection

When Dubai prepared for Expo 2020, the planners at HOK laid out the site around one central square, with three districts around it: Opportunity, Mobility and Sustainability. They named it Al Wasl, the historic name of Dubai, which means “connection” in Arabic.

The pandemic pushed the fair back by a year. Expo 2020 opened on 1 October 2021, the day after the opening ceremony under the dome, and ran until 31 March 2022. Organisers counted more than 24 million visits, and both the opening and closing ceremonies took place on Al Wasl Plaza.

Gordon Gill's dome

The Chicago firm Adrian Smith + Gordon Gill Architecture won the commission through an international competition in 2016, and concept design started that August. Gordon Gill, the design partner, later called the plaza the best work of his career.

The pattern of the trellis comes from a gold ring about 4,000 years old, found at the Saruq Al Hadid archaeological site in the Dubai desert. The same interlocking rings became the Expo 2020 logo. Gill placed the widest part of the dome about 15 metres above the ground rather than at its base.

Al Wasl Plaza dome lit in violet during an evening at Expo 2020 Dubai
Al Wasl Plaza dome lit in violet during an evening at Expo 2020 DubaiPhoto: Dennis Sylvester Hurd, CC BY 2.0, via Wikimedia Commons

A dome made of rings

Thornton Tomasetti engineered the structure. Instead of the diagonal grid of a typical gridshell, the trellis uses nested steel rings that touch one another and carry loads in bending. Laing O'Rourke was the general contractor.

The Italian steel specialist Cimolai Rimond fabricated the trellis in Italy, and the last pieces left for Dubai on 26 June 2018. The frame contains about 13.6 kilometres of steel, and Expo put its weight at 2,544 tonnes.

Between the rings sit 631 fabric panels in 30 different shapes, covering about 17,400 square metres. They are PTFE-coated fibreglass mesh in a custom tan colour, chosen so the fabric shades the plaza by day and works as a projection screen at night, visible from inside and outside.

The night they lifted the crown

The hardest moment came on 18 September 2019. The crown at the top of the dome, 550 tonnes of steel and 22.5 metres tall, had been assembled on the ground. Crews raised it by strand jacking: 18 hydraulic jacks on 18 temporary columns pulled it up on steel cables, about 830 tonnes in all with the lifting gear.

The crown went up overnight to its place 45 metres above the ground, where 53 temporary brackets held it. The tolerance was three millimetres, and 800 engineers and technicians tracked the movement with GPS. “We had one chance to get this right,” said Ahmed Al Khatib, chief development and delivery officer of Expo 2020. Welding the crown into the trellis took another 25 days.

Light, sound and a stage that rises

Inside the trellis, 252 Christie D4K40-RGB laser projectors, housed in 42 pods around the inner perimeter, turn the fabric into a single 360-degree image. Below the plaza, tunnels and backstage spaces feed a stage that can rise from underground.

The plaza holds up to 10,000 people. Its first big night was the 90-minute opening ceremony on 30 September 2021. After the fair, Expo City Dubai hosted COP28, the UN climate conference, from 30 November to 12 December 2023, and the plaza sat in the Green Zone open to the public.

Visiting today

Expo City Dubai opened on the former Expo site in October 2022, and entry to Al Wasl Plaza is free. The dome hosts seasonal programmes: the last Al Wasl Season ran from 31 October 2025 to 2 May 2026, and Winter City is on the calendar for December 2026.

Ticketed attractions such as Terra, the former Sustainability Pavilion, are a short walk away, and the Expo 2020 station on the Dubai Metro Red Line brings you straight to the site. Come after dark, when the projections run and the trellis glows against the sky.

Records and recognition

  1. Guinness World Records title for the largest interactive immersive dome: 24,038 square metres, set on 14 July 2023, with visitors able to change the dome's light and sound from a tablet.
  2. Billed at Expo 2020 as the world's largest 360-degree projection surface, a claim by the organisers and Christie rather than a Guinness title.
  3. RIBA Middle East Award 2025 in the Design for Living category, in the first year of the programme.
  4. Winner in the Recreational Architecture category of the Architecture MasterPrize 2022.
  5. International Architecture Award 2021 from The Chicago Athenaeum.

Living and investing in Expo City Dubai and Dubai South

Expo City Dubai covers about 3.5 square kilometres of the former Expo site. Its master plan, approved in October 2024, provides for more than 35,000 residents and 40,000 people working there, with DP World's global headquarters on site. In September 2024 Dubai approved an AED 10 billion expansion of the Dubai Exhibition Centre here, taking its exhibition space from 58,000 to 180,000 square metres.

Next door, Dubai South surrounds Al Maktoum International Airport. In April 2024 Dubai approved a new passenger terminal costing AED 128 billion, with an eventual capacity of more than 260 million passengers a year; the first phase is planned for around 2032. The area offers apartments, townhouses and villas, much of it sold off-plan. It draws families who want space and parks, and people who work in aviation and logistics.

This is a long-horizon market: timelines can shift, and shops, schools and clinics arrive in stages. Check the payment plan, the escrow arrangements and the developer's completed buildings, and look at the flight paths. Malik weighs each project against nearby prices, upcoming supply and rental demand, and checks the current Golden Visa and mortgage rules for your case.

Homes you will find here

ApartmentsTownhousesVillasOff-plan homes with payment plans

Questions about Al Wasl Plaza

Short answers, checked November 2026. Ask Malik if yours is not here.

Ask your question
Is Al Wasl Plaza free to visit?

Yes. Entry to Al Wasl Plaza at Expo City Dubai is free, and you can walk under the dome whenever the site is open. Some seasonal events and nearby attractions such as Terra need tickets. The Expo 2020 metro station is next to the site.

How big is the Al Wasl dome?

The dome is 67.5 metres tall and 130 metres in diameter. Its steel trellis holds 631 fabric panels, and 252 laser projectors turn the surface into a 360-degree screen you can see from inside and outside. The 550-tonne crown went up in September 2019.

Which Guinness World Record does Al Wasl Plaza hold?

Guinness World Records lists Al Wasl Plaza as the largest interactive immersive dome, measured at 24,038 square metres on 14 July 2023 and announced that October. Visitors can change the dome's lighting and sound through a tablet, which is the interactive part of the title.

Can you buy property near Expo City Dubai?

Yes. Expo City Dubai and the neighbouring Dubai South master community both sell homes to international buyers, from apartments to townhouses and villas, and much of it is off-plan. Timelines for the airport and for new homes can move, so check handover dates and payment plans carefully before you commit.

More of Dubai

Discover Dubai

WhatsAppEmail 24/7